Bathroom plumbing: shower, bath, basin and toilet set out, waste and water rough-in, then fit-off to the finished surfaces.
Kitchen plumbing: sink and dishwasher wastes, mixer and filtered water points, and appliance connections coordinated with the cabinetmaker.
Laundry plumbing: trough, washing machine stops and floor waste relocated or renewed as part of the rework.
Plumbing rough-in: water, waste and vent pipework installed, tested and set out to the approved plan.
Plumbing fit-off: tapware, mixers, cisterns, wastes and fixtures installed and commissioned after tiling.
New home and extension plumbing: full water, sanitary and drainage installation for new builds and additions.
Hot water relocation and replacement: a new or relocated unit sized to the finished household.
Set out on site
15+ years' experience
Rough-in pressure tested
Sequenced to your build
We book rough-in and fit-off around the waterproofer, tiler and cabinetmaker.
Documented in writing handled
Clean handover
I was extremely impressed by the efficiency, professionalism and service provided. Cannot recommend them enough!
I recently used this new plumbing company and couldn't be happier with the experience. From the initial phone call through to the completion of the job, the team was professional, friendly, and incredibly responsive. Read More
| What to check | Keeping the layout works | Relocating is the better call |
| Drainage | Existing wastes have correct fall where the new fixtures go | Fall is marginal, or a waste would run uphill to suit the layout |
| Building structure | Timber floor with subfloor access, or a wall that can be opened | Concrete slab, where new wastes mean cutting and re-coring |
| Existing pipework | Sound copper and PVC with life left in it | Original galvanised or lead-jointed pipework at end of life |
| The room itself | Layout works and only the finishes are dated | Poor layout is the actual reason for renovating |
On renovations the plumbing rarely holds up a job on its own. It holds up a job when it arrives out of sequence. Measured Plumbing works to the builder’s program and brings the commercial habits that suit staged work: confirmed dates, documented variations, and progress recorded as the job moves.
For owner-builders, that means someone telling you what has to happen next and when. In an apartment, the owners corporation usually needs to approve access and works before demolition starts.
Usually, though drainage decides how straightforward it is. New wastes need adequate fall to the existing connection, which is simpler over a timber subfloor than through a concrete slab. It is assessed on site before the design is finalised.